Work Carried Out on the Project:
Facade: Existing cracks and structural damage were repaired using professional repair mortars.
Facade: A silicone paint primer was applied.
Facade: The final stage involved finishing with acrylic paint.
Pergola: Repair and renovation work was carried out.
Pergola: Synthetic gloss oil paint was applied.